Polution Engineering
Interactive telemetry controls remedial operations at hazerdous waste site. Off-site
control reduces operating costs and project duration.

Transformer Efficiency Evaluation
Transformer loss evaluation leads to lower costs. Optimization of design considers
cost of materials, rate structure, electrical losses and user's rate of return.